Bad cabling is invisible until it costs you. A wall full of unlabeled, untested, undocumented runs is a slow-motion problem that compounds every time you add a switch, a camera, a phone system, or a new hire. We design, install, and document structured cabling systems built to support everything you plug in โ now and when you grow.
Cabling installed without a design ends up re-installed. Cut-rate runs fail certification. Unlabeled infrastructure becomes a wall of mystery when your IT person leaves. And a building wired for 100Mbps in 2010 doesn't support the wireless APs, IP cameras, VoIP phones, and workstations you're running today.
From the initial site walk to the as-built drawings handed off at close-out, every engagement covers the full scope.
Site survey and structured cabling design covering horizontal runs, backbone topology, MDF and IDF placement, pathway and conduit routing, and outlet counts. Designed to ANSI/TIA-568 and local code โ delivered before the first drill hits the wall.
Horizontal cabling runs to workstations, APs, cameras, VoIP handsets, and any PoE device โ properly managed, labeled, and terminated. Cat6A where 10GbE or PoE++ is needed; Cat6 where 1GbE suffices. No mystery runs, no unlabeled ports.
Main and intermediate distribution frame installation โ rack or wall-mount, patch panels, cable management, labeling, and grounding. Sized for current density and next-phase growth. Clean builds that the next technician can follow.
End-to-end certification of every run with calibrated test equipment โ wire map, length, insertion loss, return loss, and NEXT. Fails get replaced, not hidden. Full test reports delivered as part of project close-out documentation.
Floor plan with outlet locations, panel schedules, run IDs, and test results โ in a format your IT team and next contractor can use. Not a snapshot on someone's phone. Delivered digitally and in print.
Audit and remediation of inherited or undocumented cabling โ identifying failed runs, unlabeled infrastructure, and capacity gaps. Then extending or replacing what's needed to match the current environment's demands.
Panel schedules with run IDs. Floor plans with outlet locations marked. Certification test results for every port. Rack elevation diagrams for each MDF and IDF. A set of documentation that travels with the building โ not with the installer.
A site assessment takes an hour. We'll document what's there, identify what's missing or failing, and tell you exactly what a proper installation covers for your space.